/INDUSTRIES / CONSTRUCTION
Measure the site, not the argument.
From the first topo to the closeout record: RTK/PPK-corrected aerial capture that drops into the projection your survey and GIS teams already use, with the method stated so the numbers can be checked.
/01
Pre-construction
Topographic surface, orthomosaic and contours for design and the pre-con record.
Aerial survey & mapping
/02
Earthworks
Cut, fill and stockpile volumes against a corrected surface.
During dig
/03
Progress
Dated orthomosaics for the monthly, the claim and the lender.
Aerial survey & mapping
/04
Closeout
As-built surface and exposed-utility record for handover.
As-built closeout
Where this stops
We produce survey-grade data; we don’t stamp it. Legal surveys and engineering sign-off stay with your BCLS or P.Eng. Dense canopy, active crane airspace and sites inside controlled airspace limit what we can fly and when.
By industry overview: Industries
Working by dig phase? For contractors