For contractors / During dig
Measure the spoil before you argue about it.
Progress and volume capture while the excavation is open: stockpiles, cut and fill, and the state of the trench on the day. Measured against an RTK/PPK-corrected surface, not eyeballed from the truck.
What it is for
Spoil and stockpile volumes
Volumes measured between corrected surfaces, with the method and check points stated.
Progress on the day
A dated orthomosaic of the open excavation for the daily, the claim and the owner.
Trench and exposure photos
Close visual frames of the trench and anything exposed, georeferenced to the same record.
What we need
Share the site address, the planned capture rhythm, and the person who can confirm site access. Flag changes to dig limits, active work areas, and any timing constraints before each visit.
Where this stops
Volumes are as accurate as the surfaces they’re measured between; we state the method and the check points, and we don’t stamp quantities for payment without your engineer’s review.
Send the site and the dig date. We’ll say what we can fly and what you’ll receive.
or call +1 (604) 300-8719